ENERGY  INFRASTRUCTURE
           SOLUTIONS



ABOUT CPM

At CPM we understand the complexity of realizing any energy-related infrastructure project. Since 1988, CPM has been providing tailor-made solutions for our clients that go beyond mere engineering and constructions.

More than 30 Years of on-field expertise

From Aceh to Sulawesi, we understand the importance of not just the terrain but also the people we work with.

wide ranging capabilities from civil to pipeline constructions

More than 3500Km of pipeline across South East Asia as well as large-scale civil construction projects to our name.

Business Development approach to projects

Solutions that are unique to our client’s needs from conception to construction including Turnkey system capability


Internal Plan Equipment

PIPELAYER

Pipelayers are more commonly known as sidebooms, and its sidebooms that gives pipeline contractors their identity. They are the workhorses that can cope with most terrains thrown at them and they can make or break a project.



SWAMP EXCAVATOR

Pipelines can go through unforgiving environments and Swamp Excavators are able to clear a path and dig trench in wet ground up to 1 metre water depth . Swamp Excavators get the job done without the need to build access through swamps for conventional excavators







INTERNAL CLAMP

Internal Pipe Line –Up Clamps ensure millimeter accuracy when aligning two adjoining pipes ready for welding. The process is repeated time and time again providing consistent joint set-up for welding.



PIPE BENDING MACHINE

Pipelines follow the natural contours of the land and this is achieved by using Cold Pipe Bending Machines which allow the bending of individual 6 “ thru 60” diameter pipes to fit direction and elevation changes crucial to pipeline construction

PAYWELDER MACHINE

When construction full swing, the welding crew needs to move from one joint to the next quickly. Track Paywelders provide the welding crews with reliable power for welding, electricity and compressed air and the mobility to overcome the most challenging terrain.

AUGER BORING

One of the challenges of pipeline construction is navigating existing infrastructure. Be it roads, rail, or existing underground utility services auger boring machines provide a trenchless crossing solution by drilling horizontally under or over obstacles

Clients

Contact US

HEAD OFFICE
PT. CITRA PANJI MANUNGGAL
JL. Ciputat Raya no.16.
Kebayoran
Jakarta Selatan, Indonesia

contact@cpmgroup.co.id

Phone: +6221 765 3723
Mobile: +6221 765 8806
Fax: +6221 765 8806

Download our Latest
Company Profile Here